Skip to content
Omnetric

Solutions

Empowering the Energy Transition

Utility-scale solar and wind first — the full distribution scope from combiner box to connection bay — alongside power infrastructure for data centres, EV charging, industry and mining.

Grid connection compound at a solar and wind farm, with a radiator-cooled power transformer and containerised switchrooms in front of solar arrays and wind turbines.

Solution 01

Utility-Scale Solar & Wind

Distribution equipment across the whole plant — from the string combiner box through inverters, collection and the connection bay — for solar, wind and Battery Energy Storage Systems.

  • Inverter duty transformers stepping block output to 33 kV collection
  • Grid connection transformers for 132 kV to 330 kV transmission connection
  • Switchgear, DC and AC cabling, earthing and lightning protection
  • SCADA, optical fibre and metering back to the main control room

Outcome: One supplier across the balance of plant, so the collection design, the transformers and the connection bay arrive matched to each other.

Products deployed

Row of transformers and switchgear cabinets in a data centre plant room, linked by illuminated busbar runs alongside server racks.

Solution 02

Data Centre Power Infrastructure

High-capacity, ultra-reliable dry-type and continuous-load configurations for cloud and AI facilities.

  • Dry-type configurations suited to occupied and indoor plant rooms
  • Continuous-load designs for sustained high utilisation
  • Engineered for the energy densities of modern AI compute

Outcome: Power infrastructure matched to the density and uptime expectations of AI-era compute.

Products deployed

Commercial EV fast-charging hub with cars connected to charging pedestals, backed by pad-mounted distribution cabinets and underground cable routes.

Solution 03

EV Charging Networks

Upgrading LV network capability with compact, high-efficiency padmount and kiosk solutions.

  • Compact padmount and kiosk units for constrained charging sites
  • Designed for the volatile load profiles of fast-charging hubs
  • High-efficiency units that lift LV network capacity

Outcome: Charging hubs that hold up under the spiky, unpredictable demand of commercial fast charging.

Products deployed

Skid-mounted substation on a concrete pad at a remote open-pit mine at sunset: an oil-filled transformer with HV bushings beside two containerised switchrooms, with an excavator and haul truck working the pit behind.

Solution 04

Turnkey Industrial & Mining Grids

End-to-end design, modular delivery and rapid installation of ruggedised power systems.

  • End-to-end design through to commissioning
  • Modular delivery for rapid installation in remote locations
  • Minimises on-site civil works and labour

Outcome: Remote sites energised faster, with far less civil work and labour on the ground.

Products deployed

Not sure which solution fits?

Michael, our AI intake agent, will take you through the questions an engineer would ask — load profile, site constraints, compliance requirements and timeline — and hand the brief to the right team.